Selected project references of MAX STREICHER


Fuel supply system Munich Airport, Germany
6 km DN 250-450, StE 290.7, 242 hydrants with hydrant cases, 9 valve chambers ZLT, 12,000 m³ tank
Client: Flughafen München GmbH, Germany
 
 


Underground Storage Compressor Station Breitbrunn, Germany
Installation of the Piping System DN-25-600, PN 16-250
Client: Ruhrgas AG, Germany
 
 
 


Pipeline connection Mittelplate, Germany
Installation of 6 temporary pits, 70 x 6 m, 12 (6x2) horizontal directional drillings (1.100 m up to 1.400m), DN 250 & 150, total HDDs: 7.5 km DN 250 and
7.5 km DN 150
Client: RWE DEA, Germany


Schwanheim-Elchesheim 
Eckartsweier-Bahlingen Pipeline
, Germany
92.7 km DN 1000, PN 70, L485MB
Client: TENP, Germany
 
 
 





@ Compact e+p+c GmbH & Co. KG